Competitive Advantages
What Makes DPE Different
Our specialization allows us to control every stage of the process — from engineering and manufacturing to installation and final documentation. The result is a complete, project-specific system designed for safe installation, efficient operation and long-term reliability.
Short Production Time
Engineered and manufactured within 3–4 weeks
Our streamlined engineering and in-house production process enables a typical production time of just 3–4 weeks, allowing us to respond efficiently even to projects with demanding construction schedules.
Project-Specific Technical Drawings
Every system starts with precise engineering
Detailed technical drawings are prepared individually for every project, including system dimensions, positioning, fixing points and installation details. This ensures accurate coordination with the building structure and minimizes uncertainties during installation.
Complete Integrated System
Everything required is engineered into the system
Our specially designed aluminium carrier truss incorporates the complete drive, winding, safety and fixing system. All essential installation components are supplied as part of the system, minimizing the need for additional brackets, supports or custom-made components on site.
Double seafty feature
An additional level of mechanical protection
In addition to the motor and drive system, DPE motorized curtains are equipped with an independent safety brake. In the event of a drive malfunction or uncontrolled movement, the safety brake mechanically stops the system and prevents the curtain from falling.
Smooth, Wrinkle-Free PVC
Engineered for a clean and professional appearance
The combination of carefully selected PVC material and our engineered winding system provides controlled and even movement of the curtain. Proper material tension and winding help minimize wrinkles and maintain a smooth, professional appearance during operation and throughout the system’s service life.
Static & Structural Calculations
Safety verified before installation
Project-specific static and structural calculations can be prepared to verify the loads generated by the system and confirm that the proposed installation concept is structurally suitable. Calculations are performed according to the applicable technical requirements and project conditions.
Easy Installation
Designed to simplify work on site
Every system is engineered with efficient installation in mind. Detailed step-by-step assembly instructions with 3D illustrations clearly identify components, fixing points and installation sequences, helping installers complete the work accurately and efficiently.
Operation & Maintenance Manual
Complete documentation for the end user
After installation, the system is supplied with an Operation & Maintenance Manual containing operating instructions, safety information and maintenance requirements. This provides the facility operator with the information required for correct use and long-term system performance.
Certificates & Approvals
Documented quality and compliance
DPE systems use tested materials and certified components selected according to the requirements of each application. Relevant certificates, declarations and technical documentation are provided to support project approval, installation and commissioning.
3D Visualization
See the solution before it is built
When required, we can prepare 3D visualizations of the proposed system within the project environment. This helps architects, consultants and clients understand the final configuration, evaluate integration with the building and make informed decisions before production begins.
